ELKFORD FIRE HALL

IN ASSOCIATION WITH
WSA Logo

CLIENT
District of Elkford

DESCRIPTION

Civil site works for a significant expansion of the existing Elkford Fire Hall including on-site storm water disposal and grading design.

Since the project location was many hours’ drive from office, I conveyed my site inspection report as an infographic drawing sheet with embedded photos detailing particular requirements. This was very well received by the general contractor, as the construction crew was able to clearly visualize the inspection results in the field office, address follow up questions with me over the telephone, then confirm satisfactory completion with updated photos sent electronically. This removed the need for additional costly site visits and thereby saved the client a notable portion of the civil engineering consulting fees.

SERVICES RENDERED

  • Site grading design
  • On site storm water collection and disposal design
  • Tendering
  • Construction progress inspections
  • Innovative infographic reporting – embedded on a project drawing sheet to enable ease of review by client and contractors.

Elkford Fire Hall Inspection Report